<< Click to Display Table of Contents >> Navigation: IMS version 21.9 > IMS Basics - User Guide > Bulk Loader > Bulkloading - Circuit - Add and Remove Ports |
Circuit port modification with Bulkloader
To add/remove ports to a circuit using the bulkloader feature follow the same general steps described above:
These steps are:
▪Change circuit(s) to MI status.
▪Change status of old ports.
▪Add new ports.
▪Change the circuit back to MI status.
These 4 actions can be done with the same file, though any errors on a previous step will cascade into the
next steps i.e., If a circuit cannot be changed to MI status the system won’t allow for the old port to be
updated)
(NOTE: Only relevant fields are shown)
Example:

These actions will remove the relation between the circuit and the ports, but will not delete the ports from the
node, they will remain available for any future connections until the port (or card it belongs to) are removed.